pom202006


A new, heated air inlet system was designed and installed at Jungfraujoch by Empa. The bundle of tubing is about 80 meters long and was installed and fixed on the rock from the Sphinx in direction of the Mönch by Rock Tec AG. The tubing is heated, so that the gas flow is guaranteed. This new system shall minimise the contaminations, which arise due to the tourists and the touristic infrastructures. Photos: Martin Vollmer, Empa

A new, heated air inlet system was designed and installed at Jungfraujoch by Empa. The bundle of tubing is about 80 meters long and was installed and fixed on the rock from the Sphinx in direction of the Mönch by Rock Tec AG. The tubing is heated, so that the gas flow is guaranteed. This new system shall minimise the contaminations, which arise due to the tourists and the touristic infrastructures. Photos: Martin Vollmer, Empa