Sphinx pump house extension
The existing pump house on the upper Sphinx terrace was recently extended to provide more space. In addition, a core hole was drilled to provide direct access to the anteroom of the laboratory on the 2nd floor (cables, pipeline).
Below are some pictures of the remodeling and the new pump house: